Project Description
PROJECT DESCRIPTION
The hospital in Siena has built a new six-storey building (one of which is completely underground and the other one is in the basement), together with the roof that houses technological utilities, to be used as an emergency department that has: technical rooms, garage, operating block, hospitalization, intensive and sub-intensive care, reception rooms.
The building has its own Mt/bt transformer cabin equipped with two 15kV/400V resin transformers, each of 1,600 kVA, 1000 kVA emergency generator, 120 kVA rescuer, air treatment unit and refrigeration unit (heat production is centralised for the entire hospital).
Hyper STP has been the tester for the inspection of the electrical system.
Services provided: Electrical system test
Client: Azienda Ospedaliera Senese
Year: 2010
Location: Siena – Italy
Works amount: € 3.000.000,00